Kwinana Waste to Energy Plant
Acute Fabrication supplied approximately 200 tonnes of structural steel to support the concrete foundations and precast items during a critical path of the project. The scope involved 70mm thick base plates (AS/NZS 3678) with N32 Rio (AS/NZS 4671) bar fully welded and hot dip galvanised to (AS/NZS 4680). This is the first waste-to-energy plant in Western Australia and will process up to 400,000 tonnes of waste per year.
UWA Indigenous Studies building
Acute Fabrication undertook shop detailing, fabrication and surface treatment of secondary façade steel.
We were proud to be involved with such an iconic project, with the building winning multiple awards upon completion.
Gas plant platform
Acute Fabrication completed survey 3D scan, design/engineering, fabrication, surface treatment, installation and MDR.
We were engaged to design a structure to minimise the need for scaffold installation each time access is required. The structure was designed in accordance with AS4100, with welding and NDT carried out in accordance with AS1554.